Exploring the Relationship Among Planning Reliability (PPC), Linguistic Action Indicators and Social Network Metrics

Fabián Retamal1, Luis A. Salazar2, Rodrigo F. Herrera3 & Luis F. Alarcón4

11 MSc Student, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Researcher – GEPUC, Santiago, Chile, +56 2 2354 7165, [email protected], orcid.org/0000-0002-6554-5576
2PhD Candidate, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Professor, Construction Engineering, Faculty of Engineering, Universidad Andres Bello, Santiago, Chile, +56 2 2661 8346, [email protected], orcid.org/0000-0001-7339-8935
3 PhD Candidate, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Professor, School of Civil Engineering, Pontificia Universidad Católica de Valparaíso, Chile, +56 9 4413 2109, [email protected], orcid.org/0000-0001-5186-3154
4Professor, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Santiago, Chile, +56 2 2354 7165, [email protected], orcid.org/0000-0002-9277-2272

Abstract

Research has demonstrated the importance of information flow and workflow in the architecture, engineering and construction (AEC) industry. Through the correct application of the Last Planner® System, the coordination of a project and therefore its workflow has been improved. However, there is still a productivity gap that must be addressed through proper commitment management and good communication. Therefore, the objective of this article is to explore the relationship among planning reliability— using percentage plan completed (PPC) measures—linguistic action perspective (LAP) indicators and social network analysis (SNA) metrics in four construction projects that use the Last Planner® System in Chile and Colombia. A future line of research will be to analyze this relationship in conjunction with the main reliability indicators of construction projects through the application of PPC, LAP and SNA in more case studies

Keywords

Linguistic Action Perspective, Last Planner® System, Social Network Analysis, Percentage Plan Completed, Case studies

Files

Reference

Retamal, F. , Salazar, L. A. , Herrera, R. F. & Alarcón, L. F. 2020. Exploring the Relationship Among Planning Reliability (PPC), Linguistic Action Indicators and Social Network Metrics, Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) , 109-118. doi.org/10.24928/2020/0031