Last Planner and Its Role as Conceptual Kanban

Zofia K. Rybkowski1

1Assistant Professor, Department of Construction Science, College of Architecture, 434 Langford A, 3137 Texas A&M University, College Station, TX 77843-3137, USA, Phone +979/845-4354, FAX +979/862-1572, [email protected]

Abstract

Historically, the Last Planner™ System of Production Control has been coupled with the body of Lean Construction literature. However, the mechanism of the Last Planner and how it fits within accepted lean thinking has not always been apparent. This paper addresses this uncertainty. It examines simulated results from a lean simulation game and argues that the Last Planner serves the role of a conceptual kanban, among its functions—and therefore sits squarely within the domain of Lean theory.

Keywords

Last Planner System, Kanban, Airplane game, Lean Construction

Files

Reference

Rybkowski, Z. K. 2010. Last Planner and Its Role as Conceptual Kanban, 18th Annual Conference of the International Group for Lean Construction , 63-72. doi.org/

Download: BibTeX | RIS Format