IGLC.net EXPORT DATE: 19 April 2024 @CONFERENCE{Rybkowski2010, author={Rybkowski, Zofia K. }, editor={Walsh, Kenneth and Alves, Thais }, title={Last Planner and Its Role as Conceptual Kanban}, journal={18th Annual Conference of the International Group for Lean Construction}, booktitle={18th Annual Conference of the International Group for Lean Construction}, year={2010}, pages={63-72}, url={http://www.iglc.net/papers/details/724}, affiliation={Assistant Professor, Department of Construction Science, College of Architecture, 434 Langford A, 3137 Texas A&M University, College Station, TX 77843-3137, USA, Phone +979/845-4354, FAX +979/862-1572, zrybkowski@tamu.edu }, abstract={Historically, the Last Planner™ System of Production Control has been coupled with the body of Lean Construction literature. However, the mechanism of the Last Planner and how it fits within accepted lean thinking has not always been apparent. This paper addresses this uncertainty. It examines simulated results from a lean simulation game and argues that the Last Planner serves the role of a conceptual kanban, among its functions—and therefore sits squarely within the domain of Lean theory. }, author_keywords={Last Planner System, Kanban, Airplane game, Lean Construction }, address={Haifa, Israel }, issn={ }, publisher={ }, language={English}, document_type={Conference Paper}, source={IGLC}, }