TY - CONF TI - Understanding the Relationship Between Planning Reliability and Schedule Performance: A Case Study C1 - Taipei, Taiwan C3 - 17th Annual Conference of the International Group for Lean Construction SP - 139 EP - 153 PY - 2009 AU - Olano, Ricardo M. AU - Alarcon, Luis F. AU - Razuri, Carlos AD - Project Superintendent at Freeport McMoran Americas,PMP, MBA, PhD Student in Management Sciences (ESADE - Spain), E-Mail: Ricardo_Olano@fmi.com AD - Professor of Civil Engineering, Escuela de Ingeniería, Universidad Católica de Chile, Casilla 306, Correo 22, Santiago, Chile, E-Mail: lalarcon@ing.puc.cl AD - MSc, Escuela de Ingeniería, Universidad Católica de Chile, Casilla 306, Correo 22, Santiago, Chile, E-Mail: cerazuri@uc.cl ED - Cuperus, Ype ED - Hirota, Ercilia Hitomi AB - The earned-value method (EVA) monitors the progress of the project using dollar value or man hours as the metric by comparing the amount of work completed against the work planned to be complete and indicate if the project is on or behind schedule by means of the Schedule Performance Index (SPI). The Last Planner System (LPS™) increase planning reliability by reducing workflow variability, through analyzing and removing activity restrictions, analyzing causes for not fulfilled plans and monitoring its improvements by means of Percentage of Plan Completed (PPC). The paper presents two cases studies about the application of the mentioned project control techniques and shows evidence that demonstrates the relationship between planning reliability (PPC) and project schedule performance (SPI). This relationship was tested statistically showing positive trends. The results show that project time is improved by increasing planning reliability during construction phase. These findings can help project managers understand the relationship between workflow reliability and project time, and prove that the role of the professional manager needs to become more proactive. KW - Project control KW - earned-value KW - last planner KW - planning reliability and schedule performance. PB - T2 - 17th Annual Conference of the International Group for Lean Construction DA - 2009/07/15 CY - Taipei, Taiwan L1 - http://iglc.net/Papers/Details/662/pdf L2 - http://iglc.net/Papers/Details/662 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -