TY - CONF TI - The Influence of Preconstruction Phase and Lean Construction Implementation on Project Performance C1 - Auckland, New Zealand C3 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) SP - 353 EP - 364 PY - 2024 DO - 10.24928/2024/0133 AU - Hamaidi, Munther AU - Ghandour, Nour AU - Hadi, Mohammad Abdel AU - Naser, Ayman AD - Master, Civil Engineering Department, Qatar University, Qatar, Mh1003137@qu.edu.qa AD - Lean Lead, China Railway Construction Corporation Limited, Doha, Qatar, Nourghndr@hotmail.com AD - Lean Specialist, WSP International Consultant, Doha, Qatar, Mohammad.AbdelHadi@wsp.com AD - Lecturer, Civil and Environmental Engineering Department, Qatar University, Qatar, an1401569@qu.edu.qa , https://orcid.org/0000-0002-0670-9200 AB - Effective design management during the preconstruction phase has significant effects on project performance within the Architecture, Engineering, and Construction (AEC) sector. This research examines critical factors that impact the design outcomes at the preconstruction phase in the construction of infrastructure projects which affect the overall project performance. Using a sequential hybrid research approach that combines qualitative interviews and quantitative surveys, this study identifies ten crucial factors that influence project performance during the preconstruction phase. The relative importance index (RII) method is used to prioritise these factors, emphasising the most influential areas for enhancement. This study investigates the use of lean construction (LC) principles and tools to minimize the impact of these factors. These tools include integrated project delivery (IPD), building information modelling (BIM), last planner system (LPS), value stream mapping (VSM), target value design (TVD), set-based design (SBD), and choosing by advantage (CBA). Authors propose a comprehensive Lean Construction-based Risk Mitigation (LC-RM) framework to integrate these methodologies and enhance the design process during the preconstruction phase, thereby improving overall project performance. This research makes a valuable contribution to the field of construction management by providing practical recommendations for effective decision-making and lean practices during the preconstruction phase. It serves as a preliminary step towards improving construction management processes and has the potential to be further explored in future studies. KW - Lean construction KW - Design management KW - Preconstruction KW - Risk mitigation KW - Critical factors KW - Infrastructure construction project PB - T2 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) DA - 2024/07/01 CY - Auckland, New Zealand L1 - http://iglc.net/Papers/Details/2289/pdf L2 - http://iglc.net/Papers/Details/2289 N1 - Export Date: 03 April 2025 DB - IGLC.net DP - IGLC LA - English ER -