TY - CONF TI - Rigorous 2-Hour Takt Reveals Upstream Underperformance C1 - Auckland, New Zealand C3 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) SP - 238 EP - 249 PY - 2024 DO - 10.24928/2024/0219 AU - Alhava, Otto AU - O’Loughlin, Matthew AU - Haapasalo, Harri AU - Viitanen, Jaakko AU - Pitkäranta, Tomi AD - CTO, Flow Technologies Oy, Helsinki, Finland, otto.alhava@fira.fi, orcid.org/0000-0001-8820-0522 AD - Site manager, Fira Rakennus Oy, Vantaa, Finland, matthew.oloughlin@fira.fi, orcid.org/0009-0005-1317-8355 AD - Professor, Department of Industrial Engineering and Management, University of Oulu, Finland, harri.haapasalo@oulu.fi, orcid.org/0000-0001-5413-5638 AD - Project director, Fira Rakennus Oy, Vantaa, Finland, jaakko.viitanen@fira.fi, orcid.org/0009-0006-7343-2797 AD - Head of Product, Sitedrive Oy, Helsinki, Finland, tomi.pitkaranta@sitedrive.com, orcid/ 0000-0003-1100-0578 AB - The primary purpose of this study is to demonstrate that rigorous production control requires high quality and flawlessness in the upstream production process. The research approach is a quantitative case study. One-piece flow forms the theoretical framework combined with the “sea of inventories” logic. The empirical material is collected from the case company’s renovation projects’ data, documentation, meeting minutes, and training material. The definition, modelling, and analysis of the production system are fundamental to continuous improvement in construction. Systematic analysis, documentation, quality control, and quality assurance enable fact-based improvement and control of the production system. Our study, following the logic of continuously tightening requirements for control variables in the production flow, reveals upstream underperformance and drives the elimination of the problems, thus improving efficiency. In our case, company evidence shortening the takt from 4 hours to 2 hours reveals hidden problems in upstream flow, resulting in continuous improvement in production quality. Overall, our study provides evidence of the applicability of one-piece flow in construction. KW - One-piece flow KW - Toyota Production System KW - JIT KW - Takt PB - T2 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) DA - 2024/07/01 CY - Auckland, New Zealand L1 - http://iglc.net/Papers/Details/2215/pdf L2 - http://iglc.net/Papers/Details/2215 N1 - Export Date: 03 April 2025 DB - IGLC.net DP - IGLC LA - English ER -