TY - CONF TI - Expectations and Perceptions – Daily Management Meetings in Design C1 - Auckland, New Zealand C3 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) SP - 48 EP - 59 PY - 2024 DO - 10.24928/2024/0140 AU - Särkilahti, Joonas AU - Seppänen, Olli AU - Lappalainen, Eelon AD - Master of Science, Department of Civil Engineering, Aalto University, Finland, joonas.sarkilahti@gmail.com, orcid.org/0009-0000-1363-7957 AD - Associate Professor, Department of Civil Engineering, Aalto University, Finland, olli.seppanen@aalto.fi, orcid.org/0000-0002-2008-5924 AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, eelon.lappalainen@aalto.fi, orcid.org/0000-0002-7573-344X AB - Daily Management (DAM) has generated many benefits in construction, but it has been less used and studied in design management. This case study of a Finnish structural design firm provides insights into the expectations of designers regarding DAM and Daily Management Meetings (DMM), as well as their perceptions during a short experiment on implementing DAM and DMM in daily structural design work. The research data for the case study were collected through interviews, observation, and a survey conducted with the company’s larger structural design group. The main expectations of survey respondents and interviewees included improving the identification of design constraints, ensuring and enhancing the flow of information and increasing trust and team spirit. Interviewees who participated in the experiment highlighted the importance of being able to estimate their own workload and task duration, as well as gain improved knowledge of the concurrent work of other team members. Interestingly, in a larger group with many design managers, the benefit of improving the evaluation of each designer’s workload was not anticipated as a significant benefit. This study contributes to highlighting DAM’s implications for designers’ self-management of their work. KW - Lean construction KW - construction design process management KW - daily management KW - daily management meetings KW - design management PB - T2 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) DA - 2024/07/01 CY - Auckland, New Zealand L1 - http://iglc.net/Papers/Details/2197/pdf L2 - http://iglc.net/Papers/Details/2197 N1 - Export Date: 25 April 2025 DB - IGLC.net DP - IGLC LA - English ER -