TY - CONF TI - A Logistic Framework to Enable Takt Time Planning C1 - Lille, France C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) SP - 1372 EP - 1382 PY - 2023 DO - 10.24928/2023/0231 AU - Reck, Raquel H. AU - Fireman, Marcus C. T. AD - PhD Cand., Building Innov. Research Unit (NORIE), Fed. Univ. of Rio Grande do Sul (UFRGS), Porto Alegre, RS, Brazil, +55 51 33083518, raquelreck@gmail.com, orcid.org/0000-0003-1928-3461 AD - PhD Cand., Building Innov. Research Unit (NORIE), Fed. Univ. of Rio Grande do Sul (UFRGS), FoundingPartner at Climb Consulting Group, Porto Alegre, RS, Brazil, marcusctf@gmail.com, http://orcid.org/0000- 0001-5843-4715 AB - Takt Time Planning (TTP) methodology has gained growing popularity in lean construction, with the aim of improving workflow and increasing production stability. Despite the numerous research efforts surrounding TTP, there is a gap in understanding how logistics planning should support TTP in a construction project. This study presents a framework for developing logistics in a construction project that uses TTP as its planning method. The framework consists of four drivers: (a) equipment sizing, (b) layout risk study and analysis, (c) material management, and (d) structuring of daily routes and routines. The results show that the integration of TTP into the logistics framework allowed for the design of the production system to ensure Takt, and to structure a rapid response to the variations found during the LPS control cycles. Hence, the project deadline was reduce by 16.4%, or 4 months. KW - Takt Planning KW - WorkFlow KW - Last Planner System KW - Logistic PB - T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) DA - 2023/06/26 CY - Lille, France L1 - http://iglc.net/Papers/Details/2163/pdf L2 - http://iglc.net/Papers/Details/2163 N1 - Export Date: 03 April 2025 DB - IGLC.net DP - IGLC LA - English ER -