TY - CONF TI - Logistics Planning Within the Last Planner System for Highway Construction Projects C1 - Lille, France C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) SP - 1291 EP - 1302 PY - 2023 DO - 10.24928/2023/0191 AU - Antonini, Bruno G. AU - Pimentel, Fernanda M. AU - Fireman, Marcus C. T. AU - Etges, Bernardo M. B. S. AU - Campos, Frederico R. AU - Junior, João de Lima AU - Kronbauer, Bárbara K. AD - M.Sc. Candidate in Civil Eng. at Federal University of Rio Grande do Sul, Lean Consultant at Climb Consulting Group, Porto Alegre, Brazil. bruno@climbgroup.com.br, orcid.org/0000-0003-4437-4664 AD - Lean Consultant at Climb Consulting Group, Graduate in Civil Eng. at Pucrs, Porto Alegre, Brazil. fernanda@climbgroup.com.br, orcid.org/0000-0003-0230-4326 AD - PhD Candidate, M.Sc. Eng., Founding-Partner at Climb Consulting Group, Federal University of Rio Grande do Sul, Porto Alegre, Brazil, marcus@climbgroup.com.br , orcid.org/0000-0001-5843-4715 AD - PhD Candidate, M.Sc. Eng., Founding-Partner at Climb Consulting Group, Federal University of Rio Grande do Sul, Porto Alegre, Brazil, bernardo@climbgroup.com.br , orcid.org/0000-0002-3037- 5597 AD - Director Eng. at Neovia Engenharia, Curitiba, Paraná, Brazil frederico.campos@neoviaengenharia.com.br , orcid.org/0000-0002-5745-7461 AD - lanning Manager at Neovia Engenharia, Curitiba, Paraná, Brazil joao.junior@neoviaengenharia.com.br , orcid.org/0000-0001-5289-0963 AD - Planning Eng. at Neovia Engenharia, Curitiba, Paraná, Brazil barbara.kronbauer@neoviaengenharia.com.br , orcid.org/0000-0003-1370-7331 AB - This study presents a new Logistics Planning methodology implemented in a highway construction project from May to December 2022. The objective was to analyze the feasibility of using a Logistics Planning method with the help of a Visual Board, in conjunction with the Last Planner System. The research method utilized was the Design Science Research. A 6-step method was developed to enhance the Lookahead Planning routine. After the implementation of the methodology, a decrease in the total and equipment-related impact hours in the productivity fronts was observed, as well as an improvement in the PPC indicator and labour productivity in each service front. It was concluded that the use of Visual Management, combined with Logistics Planning, stimulates the engagement of the operation's employees around the project schedule, increasing the accuracy of the Master Plan. KW - Lean construction Highways KW - Last Planner System KW - Visual Management KW - Lookahead Planning KW - Logistics Planning. PB - T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) DA - 2023/06/26 CY - Lille, France L1 - http://iglc.net/Papers/Details/2126/pdf L2 - http://iglc.net/Papers/Details/2126 N1 - Export Date: 24 April 2025 DB - IGLC.net DP - IGLC LA - English ER -