TY - CONF TI - Achieving a 4-Hour Takt Time – and Driving Change With It C1 - Lille, France C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) SP - 1184 EP - 1195 PY - 2023 DO - 10.24928/2023/0146 AU - Riekki, Jaakko AU - Rannisto, Jukka AU - Lehtovaara, Joonas AU - Seppänen, Olli AU - Peltokorpi, Antti AD - Research assistant, Department of Civil Engineering, Aalto University, Finland, jaakko.riekki@aalto.fi, orcid.org/0000-0002-0306-2165 AD - VDC Manager, Haahtela-rakennuttaminen Oy, Finland, jukka.rannisto@haahtela.fi, orcid.org/0000-0002-4626- 0700 AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, joonas.lehtovaara@aalto.fi, orcid.org/0000-0002-4761-3811 AD - Associate Professor, Department of Civil Engineering, Aalto University, Finland, olli.seppanen@aalto.fi, orcid.org/0000-0002-2008-5924 AD - Assistant Professor, Department of Civil Engineering, Aalto University, Finland, antti.peltokorpi@aalto.fi, orcid.org/0000-0002-7939-6612 AB - This study seeks to validate the hypothesis that takt production can be used as a driver for implementing several lean construction concepts together and for making them work as a system. This is done by studying a single case project where takt production with a 4-hour takt time was a core element of the operating system. In studying the case, a set of lean construction concepts found present in the project are extracted and analysed. It is concluded that takt production and in particular the short takt time worked to integrate the stakeholders and enabled the individual lean construction concepts to work in a tight relationship. Future case studies could be more explicitly designed to further validate the hypothesis. KW - takt production KW - daily management KW - logistics KW - continuous improvement KW - collaboration PB - T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) DA - 2023/06/26 CY - Lille, France L1 - http://iglc.net/Papers/Details/2085/pdf L2 - http://iglc.net/Papers/Details/2085 N1 - Export Date: 03 April 2025 DB - IGLC.net DP - IGLC LA - English ER -