IGLC.net EXPORT DATE: 24 April 2025 @CONFERENCE{Amaral2023, author={Amaral, Tatiana Gondim do and Maciel, Caio Cesar Medeiros and Filho, Renato Rafael Del Grosso and Pessoni, Rubia Cristina de Souza and Paula, Gabriella Soares de and Silva, Sara Vieira da }, editor={ }, title={Results of the Causes and Impacts of Making-Do Wastes in Production in Fortaleza, Ceará, Brazil}, journal={Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31)}, booktitle={Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31)}, year={2023}, pages={1395-1406}, url={http://www.iglc.net/papers/details/2177}, doi={10.24928/2023/0250}, affiliation={Full Professor, Environmental and Civil Engineering Department, Federal University of Goiás, Brazil, tatianagondim@ufg.br, orcid.org/0000-0002-9746-4025 ; 2 Master Student, Program in Production Engineering, Federal University of Goiás, Brazil, caiocesar.eng@hotmail.com, orcid.org/0000-0002-6756-4068 ; 3 Master Student, Program in Production Engineering, Federal University of Goiás, Brazil, renato.del@discente.ufg.br, orcid.org/0000-0003-4033-7129 ; 4 Master Student, Program in Production Engineering, Federal University of Goiás, Brazil, rubia@discente.ufg.br, orcid.org/0000-0001-5318-6820 ; Student, School of Environmental and Civil Engineering, Federal University of Goiás, Brazil, gabriella_s2_soares@discente.ufg.br, orcid.org/0000-0002-7730-2838 ; Student, School of Environmental and Civil Engineering, Federal University of Goiás, Brazil, saravieira@discente.ufg.br, orcid.org/0000-0002-6379-6937 }, abstract={This report aims to present the possible relationships between the prerequisites, categories, and impacts of making-do wastes from the non-conformity data provided by the Quizquality of six companies participating in INOVACON. From the analysis of the missing prerequisites related to the city of Fortaleza, it was possible to see that labor (52.75%), materials and components (26.69%), and interdependent tasks (5.90%) presented the most associated wastes. The main categories related to wastes are component adjustments (53.84%), sequencing (21.01%), and storage (9.76%). The highlighted prerequisite information for the Goiania cases was motivated by the absence of projects, blueprints, studies, or procedures that should provide necessary information to execute work packages which were unavailable, unclear, and/or incomplete. Based on these results, the determined actions are the need to improve information management to cooperate so that there are no errors arising from incomplete projects or difficulty in passing on necessary information to the employees responsible for performing the service/work. }, author_keywords={Making-do, prerequisites, categories, impacts and work packages. }, address={Lille, France }, issn={2789-0015 }, publisher={ }, language={English}, document_type={Conference Paper}, source={IGLC}, }