TY - CONF TI - Using Production System Design and Takt Time To Improve Project Performance C1 - San Diego, California, USA C3 - 20th Annual Conference of the International Group for Lean Construction PY - 2012 AU - Fiallo C, Mario AU - Howell, Greg AD - Civil Engineer, Msc. Professor at Central University of Ecuador. Lean Construction Coordinator at Ripconciv Constructora. Av. Protugal y Eloy Alfaro. Edif. Milenium Plaza Piso 5 Of. 501. +593-333-2050 x 209, Mobile +593-996-94255; mfiallo@ripconciv.com.ec, mfiallo@sitiodeobra.com AD - President, Lean Construction Institue, Box 1003, Ketchum, Id 83340. +1-208/726-9989; ghowell@leanconstruction.org ED - Tommelein, Iris D. ED - Pasquire, Chrisitne L. AB - The heart of the Toyota Production System is increasing flow through waste elimination. Takt time is the tool that establishes how much work has to flow through a production system in a fixed time. Takt time is a straight link between customer and production system that sets the rhythm of a production system. The aim of this paper is to show how an Ecuadorian contractor tested the impact of production system using Takt time to improve performance on an infrastructure project. The site manager used Takt to design the production system and to communicate the system’s goals to production units (crews). The paper reports on the implementation process, key decision points and results. Lessons learned on this project have implications for the application of lean construction on projects in emerging economies. KW - Takt time KW - Flow KW - Production System Design KW - Visual Management. PB - T2 - 20th Annual Conference of the International Group for Lean Construction DA - 2012/07/18 CY - San Diego, California, USA L1 - http://iglc.net/Papers/Details/768/pdf L2 - http://iglc.net/Papers/Details/768 N1 - Export Date: 18 April 2024 DB - IGLC.net DP - IGLC LA - English ER -