TY - CONF TI - Integrated Production Scheduler for Construction Look-Ahead Planning C1 - Berkeley, California, USA C3 - 7th Annual Conference of the International Group for Lean Construction SP - 287 EP - 298 PY - 1999 AU - Chua, David K.H. AU - Jun, Shen Li AU - Hwee, Bok Shung AD - Associate Professor, Dept. of Civil Engrg., National Univ. of Singapore, 10 Kent Ridge Crescent, Singapore 119260, 65/874-2195, cvedavid@nus.edu.sg AD - Research Scholar, Dept. of Civil Engrg., National Univ. of Singapore, 10 Kent Ridge Crescent, Singapore 119260, 65/874-6498, engp8591@nus.edu.sg AD - Senior CAD/CAM Specialist, National Univ. of Singapore, 10 Kent Ridge Crescent, Singapore 119260, 65/874-2599, engboksh@leonis.nus.edu.sg AB - Enhancing the reliability of planning is the key to achieving stable construction flow and, subsequently, high productivity and improved product quality. Traditional look-ahead scheduling tools are not suitable for producing robust work schedules. Being aware of the inherent problems in traditional scheduling methods, we propose an improved scheduling tool, the Integrated Production Scheduler system, to help produce quality-assured look-ahead schedules by incorporating integrated information on the availability of resources and information into activities. This tool is developed specially for implementing Lean Construction philosophy in construction process design. Its principles for achieving a quality, timely and transparent schedule are described in this paper. It is based on a distributed scheduling model with the utilization of Internet technologies, such as JavaBeans and XML. KW - Integrated information KW - scheduler KW - look-ahead planning KW - JavaBeans KW - XML KW - Internet PB - T2 - 7th Annual Conference of the International Group for Lean Construction DA - 1999/07/26 CY - Berkeley, California, USA L1 - http://iglc.net/Papers/Details/66/pdf L2 - http://iglc.net/Papers/Details/66 N1 - Export Date: 26 April 2024 DB - IGLC.net DP - IGLC LA - English ER -