TY - CONF TI - The WIP-Push-Wave: a leading indicator for project production control C1 - Singapore, Singapore C3 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) SP - 1547 EP - 1558 PY - 2026 DO - 10.24928/2026/0149 AU - Gabai, Doron S. AU - Haronian, Eran AU - Sacks, Rafael AU - Miera, Mark K. AU - Cloyd, Tabitha D. AD - PMP, PgMP, LCI Israel Chairman, Strategic Planner, Intel Corporation, AZ Construction, USA. doron.gabai@intel.com AD - Lecturer, Department of Civil Engineering, Ariel University, Ariel, 40700, Israel, eranha@ariel.ac.il AD - Professor, Virtual Construction Laboratory, Faculty of Civil and Env. Eng. Technion – Israel Institute of Technology, cvsacks@technion.ac.il, orcid.org/0000-0001-9427-5053 AD - PMP, Senior Director of Construction, Intel Corporation, AZ Construction, USA. mark.k.miera@intel.com AD - Director of Construction, Intel Corporation, AZ Construction, USA. tabitha.d.cloyd@intel.com ED - Hamzeh, Farook ED - Poshdar, Mani ED - Garcia-Lopez,, Nelly P. AB - Project management has traditionally depended on lagging indicators, such as the ‘Earned Value’, that provide retrospective feedback and support reactive decision-making. In contrast, leading indicators that monitor production conditions and enable proactive control have been proposed in the Lean Construction body of knowledge. Metrics such as Percent Plan Complete (PPC) and subsequent flow-based measures have advanced this shift toward assessing workflow reliability and production status rather than after-the-fact outcomes. This paper introduces the WIP-Push-Wave (WPW), a novel leading indicator that captures and visualizes the wave effect created as Work in Progress (WIP) accumulates and rolls forward across planning cycles. By quantifying the degree to which the planned WIP exceeds the demonstrated capability of the production system, the WPW reveals overload conditions as they emerge, allowing intervention before performance losses occur. We present a case study of a portfolio of 1,300 projects, demonstrating the recurring wave phenomenon where unfinished work rolls forward, inflating WIP and degrading performance. We interpret this pattern as a self-reinforcing feedback loop driven by overcommitment and optimism bias in planning, and propose that a balancing loop, grounded in production principles, is needed to break this cycle and prevent such waves from forming. The WPW enables managers to identify planning biases, guiding them to improve the planning process. KW - Leading indicators KW - optimized cycle-time flow KW - portfolio management KW - production planning and control. PB - T2 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) DA - 2026/06/22 CY - Singapore, Singapore L1 - http://iglc.net/Papers/Details/2467/pdf L2 - http://iglc.net/Papers/Details/2467 N1 - Export Date: 19 June 2026 DB - IGLC.net DP - IGLC LA - English ER -