TY - CONF TI - VDC in Practice: A Preliminary Categorization of Production Metrics Reported in Scandinavia and Latin America C1 - Edmonton, Canada C3 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) SP - 1177 EP - 1185 PY - 2022 DO - 10.24928/2022/0230 AU - Majumdar, Tulika AU - Rasmussen, Steinar G. AU - Savio, Alexandre Almeida Del AU - Johannesdottír, Katrin AU - Hjelseth, Eilif AU - Fischer, Martin A. AD - Ph. D. Candidate, Department of Civil and Environmental Engineering, Stanford University, USA, tulika@stanford.edu AD - Hæhre Entreprenør, steinar.rasmussen@akh.no AD - Professor, Civil Engineering Department, University of Lima, aalmeida@ulima.edu.pe AD - Trimble Solutions Sandvika AS, katrin_johannesdottir@trimble.com AD - Professor, Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, Norway, eilif.hjelseth@ntnu.no AD - Professor, Department of Civil and Environmental Engineering, Stanford University, USA, fischer@stanford.edu AB - Architecture, Engineering and Construction (AEC) teams are increasingly using emerging management methods involving collaboration, lean construction, and digitization for managing projects. Production metrics (PM) are being used to assess the impact of these methods on project performance during run-time. A lack of common vocabulary hinders comparison of PM, making it difficult to repeat strategies used for improving project performance and for benchmarking PM across projects. Through a detailed content analysis, 2 datasets of 904 PM reported by 195 Virtual Design and Construction (VDC) practitioners in Scandinavia and Latin America were curated. Qualitative coding was used to categorize the PM into the three key VDC elements, i.e., Integrated Concurrent Engineering (ICE), Building Information Modeling (BIM) and Project Production Management (PPM) and to validate the categorization. This research enabled a comparison of PM categories across the two regions for the first time. PM categorized as ICE and PPM were reported by more than 68% professionals in both the regions. BIM PM had a disparity in reporting (Scandinavia: 30%, Latin America: 91%). It also opened a pathway to develop a common vocabulary of PM to compare, benchmark and standardize PM across VDC implementations. KW - Production metrics KW - continuous improvement KW - concurrent KW - standardization KW - process PB - T2 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2022/07/27 CY - Edmonton, Canada L1 - http://iglc.net/Papers/Details/2041/pdf L2 - http://iglc.net/Papers/Details/2041 N1 - Export Date: 27 April 2024 DB - IGLC.net DP - IGLC LA - English ER -