TY - CONF TI - Design Process Stability: Observations of Batch Size, Throughput Time and Reliability in Design C1 - Lima, Peru C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) SP - 605 EP - 612 PY - 2021 DO - 10.24928/2021/0144 AU - Lappalainen, Eelon AU - Uusitalo, Petteri AU - Seppänen, Olli AU - Peltokorpi, Antti AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, eelon.lappalainen@aalto.fi, orcid.org/0000-0002-7573-344X AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, petteri.uusitalo@aalto.fi, orcid.org/0000-0002-7230-0788 AD - Associate Professor, Department of Civil Engineering, Aalto University, Finland, olli.seppanen@aalto.fi, orcid.org/0000-0002-2008-5924 AD - Assistant Professor, Department of Civil Engineering, Aalto University, Finland, antti.peltokorpi@aalto.fi, orcid.org/0000-0002-7939-6612 AB - Despite recent developments in construction design management, too much variability still occurs in design processes. Batch size (BS) and throughput time (TT) reduction are recurring concepts in the lean construction literature related to the Last Planner© System (LPS). These three parameters are often used to reduce variability and improve flow and reliability in work processes. Some have attempted to reduce design variability through lean design management (LDM) and agile methods, but very few studies have analysed the interaction of these parameters in the design process. The purpose of this study is to investigate these variables and their interactions. Design process stability and reliability were measured over nearly two years in this study by using three parameters. According to the results, design teams with smaller BS’s of design tasks and higher percentages of planned tasks completed also had shorter design task TT’s. Designers may use these findings to improve their workflow monitoring and as a novel addition to LDM and coordination metrics. KW - Lean construction KW - Last Planner® System KW - agile KW - design PB - T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2021/07/14 CY - Lima, Peru L1 - http://iglc.net/Papers/Details/1915/pdf L2 - http://iglc.net/Papers/Details/1915 N1 - Export Date: 25 April 2024 DB - IGLC.net DP - IGLC LA - English ER -