TY - CONF TI - BIM and Visual Programming Language Supporting Project Constructability C1 - Lima, Peru C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) SP - 126 EP - 135 PY - 2021 DO - 10.24928/2021/0199 AU - Veras de Carvalho, Yan Mota AU - Olimpio, Luiz Carlos Magalhães AU - Lima, Matheus Gomes AU - Lima, Mariana Monteiro Xavier AU - Neto, José de Paula Barros AD - Lean Consultant of Capital Projects and Infrastructure, VerumPartners, Fortaleza, Brazil, +55 88 99660-3141, yanveras00@gmail.com, orcid.org/0000-0002-6038-4056 AD - Engineering Analyst - Lean Planner, Cortez Engenharia Ltda., Fortaleza, Brazil, +55 85 98638-7670, olimpio@alu.ufc.br, orcid.org/0000-0003-3576-0547 AD - Master’s Student, Federal University of Ceará (UFC), Fortaleza, Brazil, +55 88 99765-0743, matheusgsdelima@alu.ufc.br, orcid.org/0000-0002-6243-6075 AD - Adjunct Professor, Department of Architecture and Urbanism and Design, Federal University of Ceará (UFC), Fortaleza, Brazil, mariana@daud.ufc.br, orcid.org/0000-0002-6560-4070 AD - DBA., Full Professor, Department of Structural Engineering and Civil Construction, Federal University of Ceará (UFC), Fortaleza, Brazil, +55 85 99969-1871, barrosneto@gercon.ufc.br. orcid.org/0000-0001-5131-4593 AB - Construction projects need to consider the multiplicity of constructive aspects on its development process via predefined parameters. Constructability is a concept that comprehends these features, and has a direct relationship with time, cost, and quality criteria. However, it is often neglected due the difficulty in measuring its indicators during project design process. Additionally, the indicators measurement is usually laborious, resulting in waste of resources during design stage. Recognizing this scenario, this research proposes a practical tool for designers and integrated with a design software. One of the steps of the model is the identification of project performance indicator’s regarding its constructability. Following is the development of a programmable routine, created on Dynamo, used for the data collection from the BIM model. The indicators are updated in real time, granting project constructability evaluation during the modelling process. The alghorithm developed allows users to propose solutions that are almost impossible when using only a modeling software and that would require many operations. Some limitations that were identified are: the developed routines may not support unforeseen variations and since the model was built with a visual programming tool (Dynamo), it may have to undergo some adaptations for correct efficiency in other tools. KW - Constructability KW - visual programming KW - product development KW - lean construction PB - T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2021/07/14 CY - Lima, Peru L1 - http://iglc.net/Papers/Details/1889/pdf L2 - http://iglc.net/Papers/Details/1889 N1 - Export Date: 26 April 2024 DB - IGLC.net DP - IGLC LA - English ER -