TY - CONF TI - Virtual Design and Construction Application During the Bidding Stage of Infrastructure Projects C1 - Berkeley, California, USA C3 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) SP - 889 EP - 900 PY - 2020 DO - 10.24928/2020/0103 AU - Correa, Stefania Limp Muniz AD - Bidding Engineer, Andrade Gutierrez Engenharia, São Paulo, Brazil, stefania.correa@agnet.com.br, orcid.org/0000-0002-2324-533X AB - The bidding stage of infrastructure projects involves dealing with high levels of uncertainty and risks, as information at the early stage of the projects are often incomplete. Hence, the process of delivering a tender implies in making hypothesis, often based on the experience of the engineers. This leads to a series of error-prone tasks, in which Virtual Design and Construction (VDC) can add value by the implementation of its structured framework and concepts. This article aims to present the case study of VDC implementation at the bidding stage of infrastructure projects. The results show that VDC can help define a structure to the demands made to the design teams and to do better following up of the project, evidencing opportunities of improvements by the collection of lessons learned. The collocation also promotes collaboration between design and bidding teams, once the workflow and metrics were known and followed up, giving more transparency during all the process. KW - Standardization KW - Collaboration KW - Workflow KW - Virtual Design and Construction PB - T2 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2020/07/06 CY - Berkeley, California, USA L1 - http://iglc.net/Papers/Details/1821/pdf L2 - http://iglc.net/Papers/Details/1821 N1 - Export Date: 03 May 2024 DB - IGLC.net DP - IGLC LA - English ER -