TY - CONF TI - Comparative Analysis of Project Performance Between Different Project Delivery Systems C1 - Dublin, Ireland C3 - Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) SP - 663 EP - 674 PY - 2019 DO - 10.24928/2019/0183 AU - Ibrahim, Michael W. AU - Hanna, Awad S. AD - California State University, Los Angeles, United States of America AD - University of Wisconsin-Madison, United States of America AB - Project Delivery System (PDS) defines the relationship and timing of involvement between different contracting parties. The main PDSs referred to in cited literature are: Design-BidBuild (DBB), Construction Management at Risk (CMR), Design-Build (DB), and Integrated Project Delivery (IPD). By applying statistical tests such as Analysis of Variance (ANOVA) F-test and Kruskal-Wallis H-test to a dataset of 109 projects, this paper compares the performance of the four PDSs. As a result, statistically significant performance differences among the examined PDSs were identified in five performance areas: cost, schedule, quality, communication, and change management. Furthermore, performing pairwise comparisons using post-hoc statistical tests to each pair of PDSs shows that DBB performs markedly worse than the other examined PDSs, especially IPD. The findings presented in this paper should encourage industry professionals to move away from the DBB model, and towards IPD and other synergic PDSs. KW - Integrated Project Deliver (IPD) KW - Collaboration KW - Relational KW - Project Performance KW - Quantitative Analysis PB - T2 - Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2019/07/03 CY - Dublin, Ireland L1 - http://iglc.net/Papers/Details/1678/pdf L2 - http://iglc.net/Papers/Details/1678 N1 - Export Date: 18 April 2024 DB - IGLC.net DP - IGLC LA - English ER -