TY - CONF TI - Using TVD Simulation to Improve Collaboration C1 - Dublin, Ireland C3 - Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) SP - 503 EP - 514 PY - 2019 DO - 10.24928/2019/0268 AU - Musa, Muktari AU - Pasquire, Christine AU - Hurst, Alan AD - PhD Research Student, School of Architecture, Design and Built Environment, Nottingham Trent University, United Kingdom. +447436554017 muktari.musa@my.ntu.ac.uk AD - Professor, School of Architecture, Design and Built Environment and Director Centre for lean Projects, Nottingham Trent University, UK. +44(0) 115 848 2095 christine.pasquire@ntu.ac.uk AD - Senior Lecturer, School of Architecture, Design and Built Environment, Nottingham Trent University, United Kingdom. +44(0) 115 848 2878 alan.hurst@ntu.ac.uk AB - Target Value Design (TVD), a lean approach, has been implemented successfully in the past decade in various countries and its process mandates the collaboration of project participants. However, issues of adapting collaborative practices and the time it takes firsttime users to understand TVD practices have been a challenge in TVD projects. Recently, there has been an increase in the creation, reinvention and use of simulations and serious games to teach TVD and other lean principles to project stakeholders encountering them for the first time. The 50 minute version of the simulation game developed in Texas A & M University was used to illustrate TVD practice and collaboration in this study. The study used 24 industry stakeholders from a reputable real estate developer during the implementation of TVD on a live project in Nigeria. The results reported that the simulation is effective in illustrating the practices of TVD including collaboration and designing to set targets. Finally, this study recommends the inclusion of the TVD simulation game in training and workshops for project team before the commencement of construction projects because it demonstrated to be a simple and practical method of understanding collaboration and TVD practices. KW - Lean construction KW - simulation game KW - collaboration KW - target costing KW - target value delivery. PB - T2 - Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2019/07/03 CY - Dublin, Ireland L1 - http://iglc.net/Papers/Details/1663/pdf L2 - http://iglc.net/Papers/Details/1663 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -