TY - CONF TI - Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM C1 - Heraklion, Greece C3 - 25th Annual Conference of the International Group for Lean Construction SP - 877 EP - 884 PY - 2017 DO - 10.24928/2017/0172 AU - Zeng, Ningshuang AU - König, Markus AU - Teizer, Jochen AD - Ph.D. Candidate, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, ningshuang.zeng@rub.de AD - Professor, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, koenig@inf.bi.rub.de AD - Senior Lecturer and Researcher, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, jochen.teizer@rub.de AB - Modern Information and Communication Technology (ICT) make it possible to re-organize the information flow and enhance the physical flow of the Construction Supply Chain (CSC). Considering the resource status and potential risks that exist in the CSC, this paper first explores the current CSC re-organization caused by the application of Building Information Modelling (BIM) and related beneficial conditions created by ICT. It then tackles the problem of controlling risk effectively by off-site guarding the upstream of the CSC. Based on the selected approach, the concept and basic mode of a look-ahead supply schedule is proposed. Finally, results to a use case demonstrate the applica KW - Look-ahead schedule KW - CSC KW - ICT KW - BIM KW - off-site guarding. PB - T2 - 25th Annual Conference of the International Group for Lean Construction DA - 2017/07/09 CY - Heraklion, Greece L1 - http://iglc.net/Papers/Details/1369/pdf L2 - http://iglc.net/Papers/Details/1369 N1 - Export Date: 28 March 2024 DB - IGLC.net DP - IGLC LA - English ER -