TY - CONF TI - Takt-Time Planning and the Last Planner C1 - Oslo, Norway C3 - 22nd Annual Conference of the International Group for Lean Construction SP - 571 EP - 580 PY - 2014 AU - Frandson, Adam AU - Berghede, Klas AU - Tommelein, Iris D. AD - Graduate Student, Civil and Environmental Engineering Department, Univ. of California, Berkeley, CA 94720-1710, USA, Phone +1 (510) 642-3261, AFrandson@berkeley.edu AD - Production Manager, The Boldt Company, Western Operations, 2150 River Plaza Drive, Suite 255, Sacramento, CA 95833, Klas.Berghede@boldt.com AD - Professor, Civil and Environmental Engineering Department, and Director of the Project Production Systems Laboratory (p2sl.berkeley.edu), 212 McLaughlin Hall, Univ. of California, Berkeley, CA 94720-1712, USA, Phone +1 (510) 643-8678, tommelein@ce.berkeley.edu ED - Kalsaas, Bo Terje ED - Koskela, Lauri ED - Saurin, Tarcisio Abreu AB - Introduction of the Last Planner System helped to improve predictability and overall productivity in the construction industry. In manufacturing, the use of takt- time resulting in production to a set beat, has long been a center piece in leveling work flow and optimizing production lines. This paper will explore how we successfully merge the rigorous and more pre-determined structure of takt-time planning with the fluid, more interactive and responsive Last Planner System. The paper will use the Cathedral Hill Hospital Project as an example of takt-time planning in use and describe how the production team can work together with Last Planners to make sure that the structure and alignment from the takt-time plan also improve and simplify the Last Planner’s ability to plan their work successfully. We are especially interested in the dynamics around worker buy-in and the notion of manageable chunks’ of work to improve the ability for workers to plan successfully. KW - Takt-time planning KW - Last Planner™ System KW - production system design PB - T2 - 22nd Annual Conference of the International Group for Lean Construction DA - 2014/06/25 CY - Oslo, Norway L1 - http://iglc.net/Papers/Details/1063/pdf L2 - http://iglc.net/Papers/Details/1063 N1 - Export Date: 24 April 2024 DB - IGLC.net DP - IGLC LA - English ER -