The construction industry faces a number of challenges, including cost increases, schedule delays, and dissatisfied customers. The Virtual Design and Construction (VDC) methodology has emerged as a response to this. However, there is a research gap on the applications and results of VDC specifically in hospital projects. This study focuses on how the implementation of VDC influenced the results of the hospital project in the construction phase and its monitoring through metrics, using on-site observations, document analysis, and unstructured interviews as sources of evidence. Among the results, a 22% reduction in the time for dismantling the tower crane was achieved, a 24% reduction in the time for constructing the structural shell, and a saving of 25,000-man hours in the formwork, steel, and concrete items. In addition, the safety goal of zero accidents was met.
Hospital, Virtual Design and Construction, VDC, productivity, case study
Download: BibTeX | RIS Format
Reference in APA 7th edition format:
Alvarez, A. R. G., Quispe, R. R. N., Escobar, I. M. C., Melgar-Morales, M. A., Linares, F. M. A. & Pacheco, D. A. M.. (2025). Implementation of VDC in the Construction Stage of a Hospital: a Case Study. In Seppänen, O., Koskela, L., & Murata , K. (Eds.), Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (IGLC 33) (pp. 622–633). https://doi.org/10.24928/2025/0287
Shortened reference for use in IGLC papers:
Alvarez, A. R. G., Quispe, R. R. N., Escobar, I. M. C., Melgar-Morales, M. A., Linares, F. M. A. & Pacheco, D. A. M.. (2025). Implementation of VDC in the Construction Stage of a Hospital: a Case Study. IGLC33. https://doi.org/10.24928/2025/0287