https://doi.org/10.24928/2017/0128
Lean construction, standardization, production, job-sequencing, continuous improvement
Download: BibTeX | RIS Format
Reference in APA 7th edition format:
Saggin, A. B., Mota, T. R., Brito, F. L. & Mourão, C. A. M. A.. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. 25th Annual Conference of the International Group for Lean Construction (pp. 713–720). https://doi.org/10.24928/2017/0128
Shortened reference for use in IGLC papers:
Saggin, A. B., Mota, T. R., Brito, F. L. & Mourão, C. A. M. A.. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. IGLC25. https://doi.org/10.24928/2017/0128