IGLC 14, Santiago de Chile

Document Actions

Theory


Koskela, Kagioglou: ON THE METAPHYSICS OF MANAGEMENT [presentation]

Gehbauer, Stock Steffek: SWARM INTELLIGENCE AND ANT COLONY APPROACH - CAN THEY BE APPLIED IN OPTIMIZING CONSTRUCTION PROCESSES

Bertelsen, Koskela Henrich Rooke: CRITICAL FLOW - TOWARDS A CONSTRUCTION FLOW THEORY [Presentation]

Howell Macomber: WHAT SHOULD PROJECT MANAGEMENT BE BASED ON

Owen Koskela Henrich Codinhoto: IS AGILE PROJECT MANAGEMENT APPLICABLE TO CONSTRUCTION [Presentation]

Product development and design management


Bolviken: 10 STATEMENTS ON PRODUCTION AND CONSTRUCTION THEORY [Presentation]

Ballard: RETHINKING PROJECT DEFINITION IN TERMS OF TARGET COSTING [Presentation]

Robert Granja: TARGET AND KAIZEN COSTING IMPLEMENTATION IN CONSTRUCTION [Presentation]

Arbulu Soto: A DESIGN CASE STUDY - INTEGRATED PRODUCT AND PROCESS MANAGEMENT [Presentation]

Codinhoto Koskela Tzortzopoulos Kagioglou: HOW ANALYSIS AND SYNTHESIS HAVE BEEN UNDERSTOOD IN DESIGN [Presentation]

Production system design


Esquenazi, Sacks: EVALUATION OF LEAN IMPROVEMENTS IN RESIDENTIAL CONSTRUCTION USING COMPUTER SIMULATION [Presentation]

Court, Pasquire, Gibb Bower: DESIGN OF A LEAN AND AGILE CONSTRUCTION SYSTEM FOR A LARGE AND COMPLEX MECHANICAL AND ELECTRICAL PROJECT [Presentation]

González, Alarcón, Gazmuri: DESIGN OF WORK IN PROCESS BUFFERS IN REPETITIVE BUILDING PROJECTS_A CASE STUDY [Presentation]

Tommelein: PROCESS BENEFITS FROM USE OF STANDARD PRODUCTS – SIMULATION EXPERIMENTS USING THE PIPE SPOOL MODEL [Presentation]

Gallardo, Granja, Picchi, Folch: STABILIZATION AND STANDARDIZATION OF A PRECAST PRODUCTION PROCESS [Presentation]

Arbulu: APPLICATION OF PULL AND CONWIP IN CONSTRUCTION PRODUCTION SYSTEMS [Presentation]

Schramm, Rodrigues, Formoso:THE ROLE OF PRODUCTION SYSTEM DESIGN IN THE MANAGEMENT OF COMPLEX PROJECTS [Presentation]

Tommelein: PROCESS BENEFITS FROM USE OF STANDARD PRODUCTS – SIMULATION EXPERIMENTS USING THE PIPE SPOOL MODEL [Presentation]

Gallardo, Granja, Picchi, Folch: STABILIZATION AND STANDARDIZATION OF A PRECAST PRODUCTION PROCESS [Presentation]

Arbulu: APPLICATION OF PULL AND CONWIP IN CONSTRUCTION PRODUCTION SYSTEMS [Presentation]

Schramm, Rodrigues, Formoso: THE ROLE OF PRODUCTION SYSTEM DESIGN IN THE MANAGEMENT OF COMPLEX PROJECTS [Presentation]

Schramm, Rodrigues, Formoso: THE ROLE OF PRODUCTION SYSTEM DESIGN IN THE MANAGEMENT OF COMPLEX PROJECTS [Presentation]

Toolanen, Olofsson: RELATIONAL CONTRACTING AND PROCESS DESIGN PROMOTING COOPERATION [Presentation]

Prefabrication, assembly and open building


Pasquire, Soar, Gibb: BEYOND PRE-FABRICATION - THE POTENTIAL OF NEXT GENERATION TECHNOLOGIES TO MAKE A STEP CHANGE IN CONSTRUCTION MANUFACTURING [Presentation]

Ko: BUFFER EVALUATION FOR DEMAND VARIABILITY USING FUZZY LOGIC [Presentation]

Björnfot, Sardén: PREFABRICATION_A LEAN STRATEGY FOR VALUE GENERATION IN CONSTRUCTION [Presentation]

Polat, Ballard: HOW TO PROMOTE OFF-SITE FABRICATION PRACTICE OF REBAR IN TURKEY [Presentation]

Supply chain management

Isatto, Formoso: THE INTER-FIRM COORDINATION OF THE CONSTRUCTION PROJECT SUPPLY CHAIN [Presentation]

Alves, Tommelein: INVESTIGATION OF BUFFER DYNAMICS IN SHEET METAL DUCTWORK SUPPLY CHAINS [Presentation]

IT support for lean construction


Nakagawa: REAL TIME PERFORMANCE INFORMATION SYSTEM USING MOBILE PHONE [Presentation]

Folkestad: CONCURRENT DESIGN FOR PRODUCTION (CDP) - MATERIALIZING INTERFACE KNOWLEDGE ON A US RESIDENTIAL CONSTRUCTION PROJECT USING COMPUTER AIDED DESIGN OBJECTS [Presentation]

Alves, Tommelein, Ballard: SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION [Presentation]

Izaguirre, Alarcón: MULTIDIMENSIONAL MODELING_A MECHANISM FOR IMPROVING CONSTRUCTION PROJECT MANAGEMENT [Presentation]

Production planning and control


Kim, Jang: APPLYING ORGANIZATIONAL HIERARCHICAL CONSTRAINT ANALYSIS TO PRODUCTION PLANNING

Al-Sasi, Brown: AN ON-SITE MATERIAL HANDLING CALCULATION MODEL [Presentation]

Wu, Soibelman: GRAPHICAL ANALYSIS ON NON-CONFORMANCES OF CONSTRUCTION PRODUCTION PROCESSES - ONGOING RESEARCH AND CASE STUDY

Bulhões, Picchi, Folch: ACTIONS TO IMPLEMENT CONTINUOUS FLOW IN THE ASSEMBLY OF PRE-FABRICATED CONCRETE STRUCTURE [Presentation]

Saffaro, Trescastro, Rodrigues, Schramm, Formoso, Heineck: PROTOTYPING CONTRIBUTIONS FOR PRODUCTION MANAGEMENT IN CONSTRUCTION [Presentation]

Knapp, Charron, Howell: PHASE PLANNING TODAY [Presentation]

Sacks, Harel: HOW LAST PLANNER MOTIVATES SUBCONTRACTORS TO IMPROVE PLAN RELIABILITY - A GAME THEORY MODEL [Presentation]

Beary, Abdelhamid: PRIORITIZING PRODUCTION PLANNING PROBLEMS AND NORMALIZING PERCENT PLAN COMPLETE DATA USING SIX SIGMA

Harel, Sacks: SUBCONTRACTOR RESOURCE ALLOCATION IN A MULTI-PROJECT ENVIRONMENT - FIELD STUDY [Presentation]

Safety, quality and environment


Saurin, Formoso, Cambraia: TOWARDS A COMMON LANGUAGE BETWEEN LEAN PRODUCTION AND SAFETY MANAGEMENT [Presentation]

Narang Abdelhamid_QUANTIFYING WORKERS’ HAZARD IDENTIFICATION ABILITY USING FUZZY SIGNAL DETECTION THEORY

People, culture and change


Pavez, Alarcon: QUALIFYING PEOPLE TO SUPPORT LEAN CONSTRUCTION IN CONTRACTOR ORGANIZATIONS [presentation]

Garcia, Romero, Diaz: INCENTIVE PLANS FOR MEXICAN CONSTRUCTION WORKERS [Presentation]

Henrich, Abbott, Koskela: DRIVERS FOR INNOVATION IN PRODUCTION MANAGEMENT [Presentation]

Abduh, Roza: INDONESIAN CONTRACTORS’ READINESS TOWARDS LEAN CONSTRUCTION [Presentation]

Implementation and performance measurement


Arbulu, Zabelle: IMPLEMENTING LEAN IN CONSTRUCTION_HOW TO SUCCEED [Presentation]

Villarouco, Fittipaldi: A BETTER PLAN FOR CONSTRUCTION COMPANIES [Presentation]

Kemmer, Saraiva, Heineck, Pacheco, Novaes, Mourão, Moreira: THE USE OF ANDON IN HIGH RISE BUILDING

Höök: CUSTOMER VALUE IN LEAN PREFABRICATION OF HOUSING CONSIDERING BOTH CONSTRUCTION AND MANUFACTURING [Presentation]

Lim, Yu, Kim: IMPLEMENTING PPC IN KOREA’S CONSTRUCTION INDUSTRY

Azambuja, Isatto, Marder, Formoso: THE IMPORTANCE OF COMMITMENTS MANAGEMENT TO THE INTEGRATION OF MAKE-TO-ORDER SUPPLY CHAINS IN CONSTRUCTION INDUSTRY [Presentation]

Bortolazza, Formoso: A QUANTITATIVE ANALYSIS OF DATA COLLECTED FROM THE LAST PLANNER SYSTEM IN BRAZIL
Created by rcodinhoto
Last modified 2007-10-15 03:35 PM
« January 2009 »
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
 
 

Powered by Plone