TY - CONF TI - Design process planning and control last planner system adaptation C1 - Fortaleza, Brazil C3 - 21th Annual Conference of the International Group for Lean Construction SP - 369 EP - 378 PY - 2013 AU - Wesz, Josana G. B. AU - Formoso, Carlos T. AU - Tzotzopoulos, PatrĂ­cia AD - M.Sc. Candidate, Building Innovation Research Unit (NORIE), Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, RS, Brazil. Phone +55 51 33083518, jowesz@yahoo.com.br AD - Ph.D., Associate Professor, Building Innovation Research Unit (NORIE), Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, RS, Brazil. Phone +55 51 33083518, formoso@ufrgs.br AD - Senior Lecturer, School of the Built Environment, University of Salford; UK. Phone +44 161 2954284; p.tzortzopoulos@salford.ac.uk ED - Formoso, Carlos Torres ED - Tzortzopoulos, Patricia AB - Many companies are seeking to improve their design process through the application of lean principles. However, to implement lean concepts effectively, companies must first achieve basic design process stability by controlling variability and increasing reliability, which the Last Planner System (LPS) helps to accomplish. This study aims to better understand the application of the LPS in design and to propose an adaptation for the design of prefabricated steel construction systems for fast projects, through a case study carried out in a steel fabricator company. This research work was divided into three main stages. First, LPS was applied with two design teams, and an adaptation of the LPS for the specific context of the company was proposed. Second, the refined LPS was implemented in four additional design teams. Finally, an evaluation of the implementation process, based on a set of design planning and control practices was conducted, and a design planning and control model was proposed. The main impacts of the implementation were an increase in process transparency, stronger commitment in the delivery of packages, and collaborative decision-making. The paper also discusses some of the difficulties in terms of implementing medium-term planning, due to the complexity of the process. KW - Design process KW - planning and control KW - Last Planner System PB - T2 - 21th Annual Conference of the International Group for Lean Construction DA - 2013/07/31 CY - Fortaleza, Brazil L1 - http://iglc.net/Papers/Details/962/pdf L2 - http://iglc.net/Papers/Details/962 N1 - Export Date: 18 April 2024 DB - IGLC.net DP - IGLC LA - English ER -