TY - CONF TI - An Integration of a Buffering Assessment Model Based on Fuzzy Logic With LPS™ for Improving Highway Construction Process C1 - Haifa, Israel C3 - 18th Annual Conference of the International Group for Lean Construction SP - 264 EP - 273 PY - 2010 AU - Farag, Moataz AU - Gehbauer, Frtiz AU - Bhatla, Ankit AD - Research Assistant, Institute for Technology and Management in Construction (TMB), Karlsruhe Institute for Technology (KIT), Germany, farag@tmb.uni-karlsruhe.de, Tel: +49(0)721 608 5444. AD - Professor, Institute for Technology and Management in Construction (TMB), Karlsruhe Institute for Technology (KIT), Germany, gehbauer@tmb.uni-karlsruhe.de AD - Graduate student, Indian Institute of Technology (IIT), Gawahati, India, a.bhatla@iitg.ernet.in ED - Walsh, Kenneth ED - Alves, Thais AB - Highway construction projects have special attributes, owing to their usual execution in an environment characterized by varying degrees of uncertainty. This paper aims at testing the vital role of buffers design and management for increasing the reliability of scheduling as well as mitigating the influences of uncertainty on the construction project from the Lean Construction viewpoint. This research paper develops a sound and rational integration system framework of Last Planner System™, as a production control tool, and a proper buffering assessment model called FLBM, which is based on fuzzy logic system. FLBM also focuses on increasing the reliability of buffers to match the actual degree of variation by considering a set of factors contributing to variability in the execution of a project. Simulation of the model is accomplished in MATLAB using sample data to verify the model theoretically. A case study was simulated through FLBM to validate the credibility of the model practically. The results of the simulation gave a positive feedback, reflecting the actual conditions. A set of scenarios were simulated using the FLBM in order to validate the model. In a further step, the proposed model was also employed in the course of the implementation of LPS™. KW - Last Planner System KW - Buffer design and management KW - Fuzzy logic KW - Highway. PB - T2 - 18th Annual Conference of the International Group for Lean Construction DA - 2010/07/14 CY - Haifa, Israel L1 - http://iglc.net/Papers/Details/699/pdf L2 - http://iglc.net/Papers/Details/699 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -