TY - CONF TI - Waste Elimination of Mucking Process of a Petroleum Storage Tunnel Through the Value Stream Analysis C1 - Manchester, UK C3 - 16th Annual Conference of the International Group for Lean Construction SP - 155 EP - 167 PY - 2008 AU - Choi, Seokjin AU - Ku, Tae H. AU - Yeo, Dong. H. AU - Han, Seung H. AD - Ph.D. student, Dpt. of Civil and Environmental Engineering, Yonsei University, 120-749, Seoul, South Korea. Phone +82-2-2123-2799, FAX +82-2-364-5300, sjchoi@yonsei.ac.kr AD - Assistant manager, Korea National Oil Corporation, Anyang, South Korea. Phone +82-31-380-2808, keth012@knoc.co.kr AD - M.S. student, Dpt. of Civil and Environmental Engineering, Yonsei University, 120-749, Seoul, South Korea. Phone +82-2-2123-2799, totwd@yonsei.ac.kr AD - Associate Professor, Dpt. of Civil and Environmental Engineering, Yonsei University, 120-749, Seoul, South Korea, Phone +82-2-2123-2799, shh6018@yonsei.ac.kr ED - Tzortzopoulos, Patricia ED - Kagioglou, Mike AB - Construction firms are getting smarter and more effective by significantly improving their performance level at the job site. Particularly, cycle time which represents the time needed to complete one set of operation has been an important measure of productivity. In this study, cycle time of a petroleum storage tunnel which has many reiterative operations is investigated. With the aid of value stream analysis based on flow process chart, non-value adding activities of mucking-focused process are identified. Value stream mapping is then applied to simplify the current process as well as to remove crucial wastes of the process. Finally, this study suggests a scheme to improve the mucking process, which ultimately shows that applying the ‘to-be’ mode to the real site can improve the cost and average effectiveness by 9.6% and 17.7%, respectively. KW - value stream analysis KW - flow process chart KW - tunnel construction KW - mucking process PB - T2 - 16th Annual Conference of the International Group for Lean Construction DA - 2008/07/16 CY - Manchester, UK L1 - http://iglc.net/Papers/Details/554/pdf L2 - http://iglc.net/Papers/Details/554 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -