TY - CONF TI - Medium-Term Planning: Constributions Based on Field Application C1 - East Lansing, Michigan, USA C3 - 15th Annual Conference of the International Group for Lean Construction SP - 509 EP - 518 PY - 2007 AU - Kemmer, Sergio L. AU - Heineck, Luis F.M. AU - Novaes, Marcos de V. AU - Mourao, Carlos Alexandre M.A. AU - Alves, Thais da C.L. AD - Lean Initiative Coordinator, Construtora C. Rolim Engenharia Ltda., sergio@crolim.com.br AD - Assistant Professor, Department of Mechanical Production Engineering, Federal University of CearĂ¡ AD - Construction Manager, Construtora C. Rolim Engenharia Ltda., marcosnovaes@crolim.com.br AD - Procurement Manager, Construtora C. Rolim Engenharia Ltda., alexandre@crolim.com.br AD - Assistant Professor, Department of Structures and Construction Engineering, Federal University of CearĂ¡, Fortaleza, Brazil, thaiscla@yahoo.com ED - Pasquire, C.L, Christine L. ED - Tzortzopoulos, Patricia AB - The literature on lookahead planning suggests that there are six major functions embedded on its scope, i.e., shielding production, integration between long- and shortterm planning, controlling and learning, management of physical flows, cost control, and safety planning and control. Based on the literature, this paper presents a case study on the implementation of medium-term planning, a.k.a., lookahead planning, developed in a 8.758,80 m2 multi-storey residential building in the city of Fortaleza, Northeast of Brazil. Differently from other papers on this topic, the authors present a descriptive case study, based on field experience, not a prescriptive one. Recommendations provided by the literature were used to implement concepts related to lookahead planning. This paper presents evidence on how medium-term planning was firmly established as a managerial routine six months after its initial implementation and describes how the literature recommendations were put in practice. The authors also found out opportunities for improvement, e.g., constraints identified at the medium-term level had not been defined precisely resulting on low levels of task completion at the operational level. The paper concludes with recommendations based on how the company investigated has been able to sustain and improve practices related to medium-term planning. KW - Planning KW - medium-term planning KW - constraints analysis. PB - T2 - 15th Annual Conference of the International Group for Lean Construction DA - 2007/07/18 CY - East Lansing, Michigan, USA L1 - http://iglc.net/Papers/Details/501/pdf L2 - http://iglc.net/Papers/Details/501 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -