TY - CONF TI - Implementing PPC in Korea’s Construction Industry C1 - Santiago, Chile C3 - 14th Annual Conference of the International Group for Lean Construction PY - 2006 AU - Lim, Chul-woo AU - Yu, Jung-ho AU - Kim, Chang-duk AD - Graduate student, Department of Architecture Engineering, Kwangwoon University, 447-1 Wolgye-Dong, Nowon-Ku, Seoul, Korea FAX +82-2-942-7101 (icw34@kw.ac.kr) AD - Professor, Department of Architecture Engineering, Kwangwoon University, 447-1 Wolgye-Dong, Nowon-Ku, Seoul, Korea FAX +82-2-942-7101 (myazure@kw.ac.kr) AD - Professor, Department of Architecture Engineering, Kwangwoon University, 447-1 Wolgye-Dong, Nowon-Ku, Seoul, Korea FAX +82-2-942-7101 (stpkim@kw.ac.kr) AB - Developed by the Lean Construction Institute, the Last Planner ® System (LPS) consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning, and Weekly Work Plan. This paper focuses on the process of measuring the Percentage of Plan Completed (PPC) at the Weekly Work Plan stage. PPC refers to the percentage of weekly assignments completed. The results of research on the use of PPC in many other countries confirm the benefits of using PPC. In Korea’s construction industry, however, the concept of PPC is still relatively new. This paper analyzes the cases of PPC application in other countries and compares it with the production control system in Korea’s construction industry. The results of this research are expected to serve as the basis for the institutionalization of the PPC implementation process in Korea. KW - Last Planner System KW - Lookahead Plan KW - Weekly Work Plan KW - PPC KW - Time Management PB - T2 - 14th Annual Conference of the International Group for Lean Construction DA - 2006/01/01 CY - Santiago, Chile L1 - http://iglc.net/Papers/Details/436/pdf L2 - http://iglc.net/Papers/Details/436 N1 - Export Date: 25 April 2024 DB - IGLC.net DP - IGLC LA - English ER -