TY - CONF TI - An Application of Artificial Intelligence Planner for Bespoke Precast Concrete Production Planning: A Case Study C1 - Sydney, Australia C3 - 13th Annual Conference of the International Group for Lean Construction SP - 493 EP - 499 PY - 2005 AU - Benjaoran, Vacharapoom AU - Dawood, Nashwan AD - Researcher, Centre for Construction Innovation and Research, University of Teesside, Middlesbrough, TS1 3BA, UK, +44 (0) 1642-342406, FAX +44 (0) 1642-342401, b. vacharapoom@tees.ac.uk AD - Professor, Centre for Construction Innovation and Research, University of Teesside, Middlesbrough, TS1 3BA, UK, +44 (0) 1642-342405, n.n.dawood@tees.ac.uk AB - Precast concrete manufacturers are highly involved in the construction industry through the supply of bespoke products. Their workload is a complex combination of different and unique designed products, which have various delivery dates. The production process from design to manufacturing is complicated and contains uncertainties due to many factors such as: multi-disciplinary design, progress on construction sites, and costly purpose-built moulds. Lean construction concepts aim to identify and reduce all forms of wastes in the construction process including its supply chains. An integrated, comprehensive planning system called Artificial Intelligence Planner (AIP) has been proposed to improve the efficiency of the process by targeting on the production planning as a significant impact to the success of the business. Artificial intelligent techniques are used in AIP to enhance data analyses and decision supports for production planning. A case study for the implementation was conducted on a real bespoke precast concrete manufacturer. The difference between AIP and this factory setting was attended. Data from the studied were reformatted and the AIP configuration was customized. Finally, the successful implementation has showed the adaptability and flexibility of AIP to the real production conditions, and it has given the improvement of the resulted production schedules. The anticipated outcomes are the shortened customer lead-time and the optimum factory’s resource utilization. These consequently make the construction process lean. KW - Bespoke precast concrete products KW - Production planning KW - Genetic algorithm KW - Neural network. PB - T2 - 13th Annual Conference of the International Group for Lean Construction DA - 2005/07/19 CY - Sydney, Australia L1 - http://iglc.net/Papers/Details/396/pdf L2 - http://iglc.net/Papers/Details/396 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -