TY - CONF TI - Linking Production-Level Workflow With Materials Supply C1 - Sydney, Australia C3 - 13th Annual Conference of the International Group for Lean Construction SP - 199 EP - 206 PY - 2005 AU - Arbulu, Roberto AU - Koerckel, Andre AU - Espana, Fernando AD - Implementation Leader, Strategic Project Solutions Inc., 1040 Battery Street, San Francisco, CA 94111, USA, Phone: 1-415-362 3200, email: rarbulu@strategicprojectsolutions.net AD - Implementation Leader, Strategic Project Solutions Inc., 1040 Battery Street, San Francisco, CA 94111, USA, Phone: 1-415-362 3200, email: akoerckel@strategicprojectsolutions.net AD - Business Development, Strategic Project Solutions Inc., 1040 Battery Street, San Francisco, CA 94111, USA, Phone: 1-415-362 3200, email: fespana@strategicprojectsolutions.net AB - In traditional construction practice, work is done through functional silos such as planning and logistics. Typically, the planning department (or team) creates baseline schedules that drive procurement and logistics operations. Ensuring that materials are available for installation when scheduled is traditionally the objective of buyers or procurement personnel, members of another functional silo. The material management process is decoupled from work flow, potentially affecting the overall project delivery process. Lack of materials on site when required, lack of the ‘right’ materials on site, and accumulation of material inventories are just some of the types of waste generated by these practices, hampering performance through delays, low quality workmanship, cost overruns, and poor safety levels on sites. This paper presents a solution that uses Strategic Project Solutions’ (SPS) lean tools for production control (SPS Production Manager) and material management (SPS Material Manager) to improve transparency and performance across value streams, minimizing waste through the link of production- level work flow with material supply. Case studies are presented reporting better reliability of supply and demand due to a greater visibility across the value stream. Further benefits include a reduction of inventories on site, increased collaboration in the supply chain, realization of just-in-time material deliveries, and significant cost benefits. KW - Inventory KW - Just-in-time KW - Material management KW - Production control KW - Pull KW - Value stream KW - Workflow PB - T2 - 13th Annual Conference of the International Group for Lean Construction DA - 2005/07/19 CY - Sydney, Australia L1 - http://iglc.net/Papers/Details/365/pdf L2 - http://iglc.net/Papers/Details/365 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -