TY - CONF TI - Safety and Production - An Integrated Planning and Control Model C1 - Gramado, Brazil C3 - 10th Annual Conference of the International Group for Lean Construction PY - 2002 AU - Saurin, Tarcisio A. AU - Formoso, Carlos T. AU - Guimaraes, Lia B.M. AU - Soares, Aelandre C. AD - M.Sc., Assistant Professor at the University of Caxias do Sul (UCS) and Ph.D. candidate at LOPP/UFRGS (Product and Process Optimization Laboratory, Federal University of Rio Grande do Sul). Praça Argentina nº 9, 3º andar - sala LOPP. Porto Alegre, RS, Brasil. CEP 90040-020. E-mail: saurin@vortex.ufrgs.br AD - Ph.D., Associate Professor, Federal University of Rio Grande do Sul, PPGEC – Postgraduate Program in Civil Engineering, Av. Osvaldo Aranha, nº 99, 3º andar, Porto Alegre - RS, Brazil, CEP 90035- 190, formoso@vortex.ufrgs.br AD - Ph.D., C.P.E. Associate Professor at LOPP/UFRGS (Product and Process Optimization Laboratory, Federal University of Rio Grande do Sul). Praça Argentina nº 9, 3º andar - sala LOPP. Porto Alegre, RS, Brasil. CEP 90040-020. E-mail: liabmg@ppgep.ufrgs.br AD - M.Sc. candidate at NORIE/UFRGS, Quality manager at BSF Engenharia. E-mail: qualidade@bsfeng.com.br ED - Formoso, Carlos T. ED - Ballard, Glenn AB - This paper presents a safety planning and control model (SPC) that has been integrated to the production planning and control process. The model integrates safety into three hierarchical levels of production control. Safety long-term planning starts with the preliminary hazard analysis (PHA) of construction processes. These plans are detailed and updated at both medium-term and short-term planning levels. The main performance measure adopted for safety evaluation at the short-term level is the Percentage of Safe Work Packages (PSW), which monitors the degree in which work packages are safely carried out. The model also proposes a participatory mechanism that allows workers to point out existing risks as well as to evaluate risk controls. This paper discusses an empirical study in which the model was implemented in the refurbishment of an industrial building. KW - Safety KW - production planning and control KW - operations management KW - performance measurement. PB - T2 - 10th Annual Conference of the International Group for Lean Construction DA - 2002/08/06 CY - Gramado, Brazil L1 - http://iglc.net/Papers/Details/208/pdf L2 - http://iglc.net/Papers/Details/208 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -