TY - CONF TI - Maturity of TVD Implementation in Norwegian Public Building Projects C1 - Berkeley, California, USA C3 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) SP - 385 EP - 396 PY - 2020 DO - 10.24928/2020/0087 AU - Smoge, Gard Y. AU - Torp, Olav AU - Johansen, Agnar AD - MSc student, NTNU - Norwegian University of Science and Technology, Trondheim, Norway, +47 975 31 662, gardys@stud.ntnu.no, orcid.org/0000-0003-3666-2885 AD - Associate Professor, NTNU - Norwegian University of Science and Technology, Trondheim, Norway, +47 934 226 73, olav.torp@ntnu.no, orcid.org/0000-0002-1916-5097 AD - Professor, NTNU - Norwegian University of Science and Technology, Trondheim, Norway, +47 930 58 741, a.johansen@ntnu.no, orcid.org/0000-0003-0063-3679 AB - There is an emerging international interest in the Architecture, Engineering and Construction (AEC) industry towards designing and constructing building projects based on Target Cost (TC) through the development of ‘Target Costing’ and Target Value Design (TVD)4 . The aim is to create more value for the client and the users through iterative design processes focusing on optimization of value within cost limitation. The purpose of this study is to discover and bring awareness of the maturity of TVD implementation during the pre-project phase in Norwegian public building projects. Findings in the research are a result of a literature study and five case studies which included a document study and semi-structured interviews with the involved project managers (PMs) from both the client and the contractor. The case studies provide the current maturity of TVD implementation during the pre-project in a number of Norwegian public building projects and shows that the TVD characteristics are only partially implemented. TVD maturity varies across the categories: contracting, organizing, defining (business case and validation) and steering. Furthermore, enhancing maximum project value is a challenge due to the lack of visualization and the focus towards cost reduction. KW - Target Value Design KW - Target Value Design Maturity KW - Target Cost KW - Collaboration PB - T2 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2020/07/06 CY - Berkeley, California, USA L1 - http://iglc.net/Papers/Details/1813/pdf L2 - http://iglc.net/Papers/Details/1813 N1 - Export Date: 29 April 2024 DB - IGLC.net DP - IGLC LA - English ER -