TY - CONF TI - Planning the Product Development Process in Construction: An Exploratory Case Study C1 - Singapore, Singapore C3 - 9th Annual Conference of the International Group for Lean Construction PY - 2001 AU - Tzortzopoulos, Patricia AU - Formoso, Carlos Torres AU - Betts, Martin AD - M.Sc., Ph.D. student, School of Construction and Property Management, University of Salford, Bridgewater Building, Salford, Greater Manchester, M7 9NU, UK, FAX + 44 (0)161 2955011, e-mail: p.tzortzopoulos@pgr.salford.ac.uk AD - Ph.D., Associate Professor at the Federal University of Rio Grande do Sul, Av. Osvaldo Aranha, 99, 3o andar, Porto Alegre, RS, CEP: 90.035-190 Brasil. FAX:+ 55 51 316 4054, e-mail: formoso@vortex.ufrgs.br AD - BSc, Ph.D., MCIOB, Head of School of Construction and Property Management, University of Salford, Bridgewater Building, Salford, Greater Manchester, M7 9NU, UK, FAX + 44 (0)161 2955011, e-mail: m.betts@salford.ac.uk ED - Ballard, Glenn ED - Chua, David AB - The emergence of a new production paradigm has been widely discussed in the literature. Concepts developed in operations management research related to the new paradigm should also be valid and useful in construction. Unfortunately, these have been weakly applied in the product development processes in most companies, despite the importance of this process. The product development process (PDP) comprises the set of activities needed for the conception and design of a product, from the identification of a market opportunity to its delivery to the final client. Its main objective is to translate customer requirements and needs into a design solution. Successful PDP requires the effective control of the work developed by the teams involved and of the exchange of information between them. This paper aims to contribute to the integration of the existing theories related to product development and operations management, looking for linkages between them. It also presents the results of an exploratory case study that aimed to propose a model for planning and controlling the PDP, based on the adaptation of tools originally developed for physical production planning and control. This involved the implementation of a previously defined process model for managing the PDP, as a basis for long term planning. The main benefits and difficulties faced during the implementation of this planning method are discussed. KW - Product development KW - process planning KW - operations management KW - design management. PB - T2 - 9th Annual Conference of the International Group for Lean Construction DA - 2001/08/06 CY - Singapore, Singapore L1 - http://iglc.net/Papers/Details/161/pdf L2 - http://iglc.net/Papers/Details/161 N1 - Export Date: 25 April 2024 DB - IGLC.net DP - IGLC LA - English ER -