TY - CONF TI - Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects C1 - Chennai, India C3 - 26th Annual Conference of the International Group for Lean Construction SP - 829 EP - 839 PY - 2018 DO - 10.24928/2018/0526 AU - Muralidharan, Sriya AU - Krishnankutty, Pramesh AU - Hwang, Bon-Gang AU - Caldas, Carlos AU - Mulva, Stephen AD - Research Assistant, Department of Building, National University of Singapore, 4 Architecture Drive, Singapore, 117566, +65 8696 8214, bdgsriy@nus.edu.sg AD - Research Associate, Department of Building, National University of Singapore, 4 Architecture Drive, Singapore, 117566, +65 90998262, bdgkp@nus.edu.sg AD - Associate Professor, Department of Building, National University of Singapore, 4 Architecture Drive, Singapore, 117566, +65 8138 4674, bdghbg@nus.edu.sg AD - Professor, Department of Civil, Architectural and Environmental Engineering, University of Texas at Austin, TX, USA, +1 (512) 471-6014, caldas@mail.utexas.edu AD - Director, Construction Industry Institute, Austin, TX, USA, +1 (512) 232-3013, smulva@cii.utexas.edu AB - Construction labour is a significant cost factor for petrochemical plant owners and their contractors. Enhancing labour productivity is therefore indispensable for the petrochemical industry in order to achieve sustainable development. Considering the variety of projects undertaken by this industry (i.e. construction and more particularly, maintenance and shutdowns/turnarounds), there is a lack of standard methods for assessing labour productivity. This generates a need for developing productivity assessment practices suitable for all project types. This paper presents solutions for labour productivity improvement based on a study conducted at various petrochemical plants. The study developed and implemented a modified Activity Analysis method suitable for the site conditions, with a focus on maintenance activities and shutdown/turnaround projects, which were rarely considered on previous productivity assessment approaches. Conducted over two cycles, this study assessed the current labour productivity, identified barriers, and analysed the efficacy of solutions implemented to mitigate these barriers. The aggregate direct work percentage was found to have increased in the second cycle. The analysis of labour productivity through Activity Analysis in maintenance and shutdown/turnaround projects is a key contribution of this study. The findings provide a basis for assessing and benchmarking labour productivity in the petrochemical industry KW - Labour KW - Productivity KW - Activity Analysis KW - Continuous improvement KW - Benchmarking PB - T2 - 26th Annual Conference of the International Group for Lean Construction DA - 2018/07/18 CY - Chennai, India L1 - http://iglc.net/Papers/Details/1608/pdf L2 - http://iglc.net/Papers/Details/1608 N1 - Export Date: 28 March 2024 DB - IGLC.net DP - IGLC LA - English ER -