TY - CONF TI - Process-Based Cost Modeling Framework and Case Study C1 - Chennai, India C3 - 26th Annual Conference of the International Group for Lean Construction SP - 46 EP - 57 PY - 2018 DO - 10.24928/2018/0523 AU - Nguyen, Hung V. AU - Tommelein, Iris D. AU - Martin, Paul AD - BIM Process Manager, Herrero Builders, Inc. 2100 Oakdale Ave, San Franc., CA 94124, Lecturer, Civil and Envir. Engrg. Dept., UC Berkeley, hung-nguyen@berkeley.edu, orcid.org/0000-0001-6625-2962. AD - Professor, Civil and Envir. Engrg. Dept., Director, Project Production Systems Lab., Univ. of California, Berkeley, CA 94720-1712, +1 510 643-8678, tommelein@berkeley.edu, orcid.org/0000-0002-9941- 6596 AD - Project Exec. at XL Construction, Inc. 343 Sansome St. Suite 505 San Franc., CA 94104, Adj. Professor, UC Davis Extension, California, pmartin@xlconstruction.com, orcid.org/0000-0001-9148-6891. AB - This paper provides a theoretical basis with reasons why traditional cost modeling methods are insufficient to support project delivery whereby product and process design are integrated and rapid cost feedback facilitates trade off analysis between multiple design alternatives. Traditional cost models do not sufficiently reflect cost changes due to changes in process design. This prompted our research into an alternative cost modeling method able to: (1) specify cost changes due to changes in product design, (2) specify cost changes due to changes in process design, and (3) provide rapid cost feedback to assist decision making during design/planning phases. This led to developing the Processbased Cost Modeling (PBCM) framework that is presented in this paper. The PBCM framework includes three phases: (1) collecting process and cost data, (2) mapping this data to Building Information Model (BIM) objects, and (3) providing cost feedback during design. The key contribution of this framework for modeling cost is that it takes into account product and process design features and can thus serve integrated project delivery teams while they explore production system design alternatives KW - Process-based Cost Modeling KW - Cost Estimating KW - Target Value Design KW - Lean construction PB - T2 - 26th Annual Conference of the International Group for Lean Construction DA - 2018/07/18 CY - Chennai, India L1 - http://iglc.net/Papers/Details/1570/pdf L2 - http://iglc.net/Papers/Details/1570 N1 - Export Date: 19 April 2024 DB - IGLC.net DP - IGLC LA - English ER -