TY - CONF TI - Assessing the Impact of Lean Methods in Mining Development Projects C1 - Heraklion, Greece C3 - 25th Annual Conference of the International Group for Lean Construction SP - 137 EP - 144 PY - 2017 DO - 10.24928/2017/0272 AU - Baladrón, Cristóbal AU - Alarcón, Luis F. AD - MSc Student, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Av. Vicuña Mackenna 4860, Edificio San Agustín 3er Piso, Macul, Santiago, Chile, Phone +56 2 2354 4244, cbaladr1@uc.cl AD - Professor, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Av. Vicuña Mackenna 4860, Edificio San Agustín 3er Piso, Macul, Santiago, Chile, Phone +56 2 2354 4244, lalarcon@ing.puc.cl AB - One of the main challenges that developing countries face is the need to increase productivity. In Chile, the most important productivity gap in both mining and construction industries is the lack of operational efficiency, caused mainly by the low adoption of advance management methods. Hence, considering the need to increase productivity through operational efficiency, lean production emerges as a management system with the objective to create value while eliminating waste, and continuously seek operational excellence. This research evaluates the impacts of the implementation of lean methods in an underground mining development project in the execution phase, which will help to better understand to what extent these methodologies can affect the performance of this type of projects. This research indicates that the implementation of lean methods in an underground mining development project had a statistical significant improvement of the mean for all indicators studied. Likewise, the implementation produced a statistically significant reduction of the variability for some indicators; moreover, there is a considerable reduction in the coefficient of variation (CV), which indicates more stable processes. In addition, this research demonstrates that there is a statistically significant correlation between the percent of plan completed and its coefficient of variation. KW - lean construction KW - lean mining KW - mining development project KW - percent of plan completed (PPC) KW - variability PB - T2 - 25th Annual Conference of the International Group for Lean Construction DA - 2017/07/09 CY - Heraklion, Greece L1 - http://iglc.net/Papers/Details/1439/pdf L2 - http://iglc.net/Papers/Details/1439 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -