TY - CONF TI - Cycle Time Reduction in Home Building C1 - Singapore, Singapore C3 - 9th Annual Conference of the International Group for Lean Construction PY - 2001 AU - Ballard, Glenn AD - Associate Adjunct Professor, Construction Eng. & Mgt. Program, Dept. of Civil & Env. Eng., University of California at Berkeley, and Research Director, Lean Construction Institute, 4536 Fieldbrook Road, Oakland, CA 94619. 510/530-8656, ballard@leanconstruction.org. ED - Ballard, Glenn ED - Chua, David AB - Even Flow Production is an innovation in residential construction intended to increase the reliability of work flow. That objective is to be accomplished by adherence to a standard schedule for sale, design, construction, and turnover of a home. In turn, increased work flow reliability reduces cycle time, the time required to deliver a home to a customer. Reliability increases as variability is reduced, allowing a reduction of slack in activity durations and of inventory previously needed to accommodate that variability. Increased work flow reliability is also a necessary condition for taking other actions to reduce cycle time. This paper proposes a method for reducing cycle time within the context of even flow production. The key innovation is the formation of multicraft teams responsible for specific systems and components of a house. Each team is to be helped to: 1) Overlap activities within their phase of the work, 2) reduce activity durations through time studies, and 3) reduce work-in-process through the development of multi-skilled workers. KW - cycle time KW - even flow production KW - multi-skilled workers KW - work flow reliability PB - T2 - 9th Annual Conference of the International Group for Lean Construction DA - 2001/08/06 CY - Singapore, Singapore L1 - http://iglc.net/Papers/Details/131/pdf L2 - http://iglc.net/Papers/Details/131 N1 - Export Date: 25 April 2024 DB - IGLC.net DP - IGLC LA - English ER -