IGLC.net EXPORT DATE: 18 April 2024 @CONFERENCE{Huang2004, author={Huang, Chun-Nen and Yi, June Seong and Russell, Jeffrey S. }, editor={Bertelsen, Sven and Formoso, Carlos T. }, title={Time Study on Two-Echelon Supply Chain for Steel Framing Construction by Using Networking Simulation Model}, journal={12th Annual Conference of the International Group for Lean Construction}, booktitle={12th Annual Conference of the International Group for Lean Construction}, year={2004}, url={http://www.iglc.net/papers/details/304}, affiliation={Associate Research Fellow and Division Chief, Ph.D. of Univ. of Wisconsin at Madison, Division of Technology Application, Taiwan Construction Research fustitute, 11F, No. 190, Sec.2, Chung-Hsing Rd., Hsintien, Taipei, Taiwan, R.O.C., Phone +866-2-98195099, FAX +866-2-86659747, chunneh@ tcri.org.tw ; Assistant Professor, Department of Architecture, Ewha Womans Univ., 11-1 Dahyun-Dong, Seodaemun-gu, Seoul, 120-750, South Korea, Phone +82-2-32773517, jsyi@ewha.ac.kr ; Professor, Department of Civil and En vir. Engrg., Univ. of Wisconsin at Madison, 2304 Engineering Hall, 1415 Engineering Drive, Madison, WI 53706 U.S.A., Phone +1 608/262-7244, FAX 608/265- 9860, russell@engr. wisc.edu }, abstract={This paper presents a case study to discuss the application of Supply Chain Management (SCM) concept to the structural steel construction industry. The impact of scheduling and resources distribution were identified and examined by using the following methodologies: 1. Time Study and 2. Networking Simulation Models. Echelon I- steel-manufacturing phase: a simulation model has been developed based on the time study of steel beam fabrication in steel shop. This mock-up model can enables us to observe and study the different facets of its productivity, scheduled utilization, and production cost on different batch sizes. Echelon II- construction job site phase: a CYCLONE simulation model has been developed based on two precedent studies: the time study of beams and columns erection under this model, which is simulated for the entire erection process, and the assessment of productivity and production cost over each task. This study has shown the fact that the project of using the design-build (D/B) delivery process has obtained higher productivity and lower production cost than that of using the design-bid-build (D/B/B) delivery process. }, author_keywords={Supply chain, steel framing construction, time study, networking simulation. }, address={Helsingør, Denmark }, issn={ }, publisher={ }, language={English}, document_type={Conference Paper}, source={IGLC}, }