IGLC.net EXPORT DATE: 29 March 2024 @CONFERENCE{Ballard2001, author={Ballard, Glenn }, editor={Ballard, Glenn and Chua, David }, title={Cycle Time Reduction in Home Building}, journal={9th Annual Conference of the International Group for Lean Construction}, booktitle={9th Annual Conference of the International Group for Lean Construction}, year={2001}, url={http://www.iglc.net/papers/details/131}, affiliation={Associate Adjunct Professor, Construction Eng. & Mgt. Program, Dept. of Civil & Env. Eng., University of California at Berkeley, and Research Director, Lean Construction Institute, 4536 Fieldbrook Road, Oakland, CA 94619. 510/530-8656, ballard@leanconstruction.org. }, abstract={Even Flow Production is an innovation in residential construction intended to increase the reliability of work flow. That objective is to be accomplished by adherence to a standard schedule for sale, design, construction, and turnover of a home. In turn, increased work flow reliability reduces cycle time, the time required to deliver a home to a customer. Reliability increases as variability is reduced, allowing a reduction of slack in activity durations and of inventory previously needed to accommodate that variability. Increased work flow reliability is also a necessary condition for taking other actions to reduce cycle time. This paper proposes a method for reducing cycle time within the context of even flow production. The key innovation is the formation of multicraft teams responsible for specific systems and components of a house. Each team is to be helped to: 1) Overlap activities within their phase of the work, 2) reduce activity durations through time studies, and 3) reduce work-in-process through the development of multi-skilled workers. }, author_keywords={cycle time, even flow production, multi-skilled workers, work flow reliability }, address={Singapore, Singapore }, issn={ }, publisher={ }, language={English}, document_type={Conference Paper}, source={IGLC}, }